Difference between revisions of "List of space shuttle missions"

From Lafayette Inc Wiki
Jump to navigation Jump to search
Line 354: Line 354:
 
| 7
 
| 7
 
| 15d 3h
 
| 15d 3h
| ETL
+
| ISS
 
| Kennedy
 
| Kennedy
 
| ISS supply.
 
| ISS supply.
Line 371: Line 371:
 
| May 3, 2012
 
| May 3, 2012
 
| {{center|[[STS-171]]}}
 
| {{center|[[STS-171]]}}
| ''Patriot''
+
| ''Constitution''
 
| 7
 
| 7
 
| 21d 4h
 
| 21d 4h
Line 397: Line 397:
 
| Edwards
 
| Edwards
 
| First flight of ''Endurance''. ETL supply and crew rotation. <!-- Launching Echo 4 crew member Oliver Mayfield (Flight Engineer 6), landing Echo 1-3 crew member Derek Ozark (Flight Engineer 1) -->
 
| First flight of ''Endurance''. ETL supply and crew rotation. <!-- Launching Echo 4 crew member Oliver Mayfield (Flight Engineer 6), landing Echo 1-3 crew member Derek Ozark (Flight Engineer 1) -->
 +
|-
 +
| 39
 +
| August 13, 2012
 +
| {{center|[[STS-174]]}}
 +
| ''Horizon''
 +
| 7
 +
| 15d 11h
 +
| ETL
 +
| Kennedy
 +
| ''Echo'' construction flight ECF-20: ''Enterprise'' CEM Exposed Facility and Logistics Module.
 +
|-
 +
| 40
 +
| September 14, 2012
 +
| {{center|[[STS-175]]}}
 +
| ''Terra Nova''
 +
| 7
 +
| 15d 6h
 +
| ETL
 +
| Kennedy
 +
| ''Echo'' construction flight ECF-21: Enhanced Alpha Magnetic Spectrometer (AMS-03).
 +
|-
 +
| 41
 +
| October 10, 2012
 +
| {{center|[[STS-176]]}}
 +
| ''Constitution''
 +
| 8
 +
| 14d 14h
 +
|
 +
| Edwards
 +
| Earth and life science research flight. Astrotech Research Double Module and dual [[Wikipedia:Extended Duration Orbiter|Extended Duration Orbiter]] pallets.
 +
|-
 +
| 42
 +
| November 7, 2012
 +
| {{center|[[STS-177]]}}
 +
| ''Intrepid''
 +
| 6
 +
| 14d 12h
 +
|
 +
| Kennedy
 +
| [[Wikipedia:Shuttle Radar Topography Mission|Enhanced Shuttle Radar Topography Mission]].
 +
|-
 +
| 43
 +
| December 12, 2012
 +
| {{center|[[STS-178]]}}
 +
| ''Liberty''
 +
| 7/7
 +
| 14d 7h
 +
| ETL
 +
| Kennedy
 +
| ETL supply and crew rotation.
 +
|-
 +
| 44
 +
| January 10, 2013
 +
| {{center|[[STS-179]]}}
 +
| ''Endurance''
 +
| 7
 +
| 15d 18h
 +
| ETL
 +
| Kennedy
 +
| ETL supply and reboost.
 +
|-
 +
| 45
 +
| February 13, 2013
 +
| {{center|[[STS-180]]}}
 +
| ''Horizon''
 +
| 7
 +
| 14d 20h
 +
| ETL
 +
| Edwards
 +
| ''Echo'' construction flight ECF-22: Prototype laser communication system installation.
 +
|-
 +
| 46
 +
| March 20, 2013
 +
| {{center|[[STS-181]]}}
 +
| ''Terra Nova''
 +
| 7
 +
| 15d 3h
 +
| ETL
 +
| Kennedy
 +
| ETL supply and reboost.
 +
|-
 +
| 47
 +
| May 12, 2013
 +
| {{center|[[STS-182]]}}
 +
| ''Patriot''
 +
| 7
 +
| 16d 6h
 +
| ETL
 +
| Kennedy
 +
| ETL resupply, reboost and PGM propellant resupply. Original launch delayed due to accident on pad which caused the death of a contractor.
 +
|-
 +
| 48
 +
| June 12, 2013
 +
| {{center|[[STS-183]]}}
 +
| ''Liberty''
 +
| 7
 +
| 11d 3h
 +
|
 +
| Kennedy
 +
| Commercial satellite launch.
 +
|-
 +
| 49
 +
| July 9, 2013
 +
| {{center|[[STS-184]]}}
 +
| ''Intrepid''
 +
| 7
 +
| 15d 7h
 +
| ISS
 +
| Kennedy
 +
| ISS supply.
 +
|-
 +
| 50
 +
| September 12, 2013
 +
| {{center|[[STS-185]]}}
 +
| ''Endurance''
 +
| 7
 +
| 15d 7h
 +
| ETL
 +
| Kennedy
 +
| ETL supply and reboost.
 +
|-
 +
| 51
 +
| October 14, 2013
 +
| {{center|[[STS-186]]}}
 +
| ''Constitution''
 +
| 7
 +
| 15d 7h
 +
|
 +
| Edwards
 +
| Earth and life science research flight. Astrotech Research Double Module and dual Extended Duration Orbiter pallets.
 +
|-
 +
| 52
 +
| November 18, 2013
 +
| {{center|[[STS-187]]}}
 +
| ''Terra Nova''
 +
| 7
 +
| 13d 7h
 +
|
 +
| Edwards
 +
| Landsat 9 launch.
 +
|-
 +
| 53
 +
| December 10, 2013
 +
| {{center|[[STS-188]]}}
 +
| ''Horizon''
 +
| 7
 +
| 14d 7h
 +
| ETL
 +
| Kennedy
 +
| ETL supply and reboost.
 
|-
 
|-
 
|}
 
|}

Revision as of 17:14, 10 January 2016

Flight numbering

Contingency missions

List of American shuttle flights

No. Launch Date Mission Shuttle Crew Duration Rendezvous
with
Landing Site Notes
1 February 5, 2009 Endeavour 4 00d 00h 31m 05s Mataveri Airport First space shuttle launch from Vandenberg Air Force Base; planned joint ISA and NASA SPACEHAB life science mission; launch failure and emergency landing.
2 March 4, 2009 Terra Nova 2 02d 16h Vandenberg Shuttle test flight; first flight of Terra Nova; first shuttle landing at Vandenberg AFB; first manned polar orbit mission.
3 June 30, 2009 Constitution 0 00d 04h 30m 45s Vandenberg Shuttle test flight; first flight of Constitution; first fully automated American shuttle mission.
4 July 29, 2009 Terra Nova 5 13d 01h Vandenberg SPACEHAB; test of 2nd generation Manned Maneuvering Unit; first spacewalk in polar orbit.
5 September 15, 2009 Constitution 0 02d 01h Vandenberg Shuttle test flight; flight development test of Liquid Rocket Boosters (LRBs) and new External Tank design.
6 October 7, 2009 Patriot 5 09d 20h ISS Kennedy First flight of Patriot. ISS supply. First ISA space station flight.
7 January 12, 2010 Constitution 5 05d 05h Vandenberg First classified Department of Defense (DoD) mission carried out by the ISA; unknown reconnaissance satellite launch.
8 February 12, 2010 Terra Nova 5/0 09d 01h Vandenberg Orbital Contingency Test Flight; TDRS-K/IUS launch. Test of shuttle contingency and in-orbit repair procedures. Complete crew transfer to Constitution, followed by automated landing.
9 February 17, 2010 Constitution 3/8 05d 05h Terra Nova Vandenberg Orbital Contingency Test Flight; Test of shuttle contingency procedures. Tested CAIB recommended procedures for crew recovery and shuttle-to-shuttle crew transfer. Landed crew of Terra Nova.
10 March 15, 2010 Patriot 6 13d 01h ISS Kennedy ISS supply. First space shuttle mission to carry a spaceflight participant. Successful in-orbit repair of damaged thermal tiles.
11 April 9, 2010 Terra Nova 0 00d 00h 46m 17s Kennedy Shuttle test flight; Return To Launch Site abort test.
12 May 10, 2010 Liberty 7 23d 01h ETL Kennedy First flight of Liberty, Echo construction flight ECF-1: External Tank Workshop, Aft Cargo Carrier, solar panels and radiators, Astrotech module.
13 June 15, 2010 Patriot 5 13d 01h ISS Kennedy ISS supply.
14 July 4, 2010 Liberty 7 26d 01h ETL Kennedy Echo construction flight ECF-3: additional interior outfitting supplies, solar panels and initial truss elements.
15 July 15, 2010 Constitution 7 07d 03h Vandenberg Callentine Climate Orbiter/IUS launch.
16 August 5, 2010 Intrepid 7 14d 06h ETL Kennedy First flight of Intrepid. Echo construction flight ECF-4: additional interior outfitting supplies, solar panels and truss components.
17 August 26, 2010 Liberty 7 19d 08h ETL Kennedy Echo construction flight ECF-5: Node 1 and Cupola.
18 September 8, 2010 Terra Nova 6 08d 04h Vandenberg Classified DoD mission; unknown reconnaissance satellite launch.
19 October 7, 2010 Patriot 7 14d 06h ISS Edwards ISS supply.
20 October 25, 2010 Liberty 7 24d 03h ETL Kennedy Echo construction flight ECF-6: Venture airlock, additional interior outfitting supplies.
21 January 3, 2011 Constitution 6 08d 01h Vandenberg Classified DoD mission; Suspected TRAPEZOID launch.
22 January 12, 2011 Patriot 7 22d 01h ETL Kennedy Echo construction flight ECF-8: Node 2, additional interior outfitting supplies.
23 February 7, 2011 Liberty 7 20d 01h ETL Kennedy Echo construction flight ECF-10: additional interior outfitting supplies, solar panels and truss components.
24 March 14, 2011 Intrepid 7 15d 06h ETL Kennedy Echo construction flight ECF-11: Centrifuge Accommodations Module.
25 April 12, 2011 Horizon 7 16d 04h ETL Edwards First flight of Horizon, Echo construction flight ECF-12: Pressurized Multipurpose Module Raffaello.
26 May 16, 2011 Patriot 7 17d 01h ETL Kennedy Echo construction flight ECF-13: Borlaug hydroponics lab.
27 June 7, 2011 Liberty 7 14d 09h ETL Kennedy Echo construction flight ECF-14: BioLab US Physiology Lab.
28 June 14, 2011 Terra Nova 7 8d 10h Vandeberg Final space shuttle launch from Vandenberg AFB. Classified DoD mission.
29 July 12, 2011 Intrepid 7 16d 04h ETL Kennedy Echo construction flight ECF-15: NeuroLab International Neurology Lab.
30 August 20, 2011 Horizon 7 15d 06h ETL Kennedy Echo construction flight ECF-16: Node 4.
31 September 12, 2011 Patriot 7 15d 03h ETL Edwards Echo construction flight ECF-17: Node 5. Educator Astronaut Linda Sherebrooke.
32 December 2, 2011 Liberty 7 14d 10h ETL Kennedy Echo construction flight ECF-18: Propulsion and Guidance Module.
33 January 8, 2012 Horizon 7 15d 06h ETL Kennedy Echo construction flight ECF-19: Enterprise Commercial Experiment Module.
34 February 20, 2012 Intrepid 7 15d 3h ISS Kennedy ISS supply.
35 March 26, 2012 Patriot 5 5d 15h DSCS-III 15 KLFX Retrieval of malfunctioning military communications satellite.
36 May 3, 2012 Constitution 7 21d 4h KLFX Earth and life science research flight. Astrotech Research Double Module and dual Extended Duration Orbiter pallets.
37 June 12, 2012 Liberty 7 18d 3h Edwards Classified DoD earth science mission. Astrotech Research Double Module and dual Extended Duration Orbiter pallets.
38 July 9, 2012 Endurance 7/7 17d 7h ETL Edwards First flight of Endurance. ETL supply and crew rotation.
39 August 13, 2012 Horizon 7 15d 11h ETL Kennedy Echo construction flight ECF-20: Enterprise CEM Exposed Facility and Logistics Module.
40 September 14, 2012 Terra Nova 7 15d 6h ETL Kennedy Echo construction flight ECF-21: Enhanced Alpha Magnetic Spectrometer (AMS-03).
41 October 10, 2012 Constitution 8 14d 14h Edwards Earth and life science research flight. Astrotech Research Double Module and dual Extended Duration Orbiter pallets.
42 November 7, 2012 Intrepid 6 14d 12h Kennedy Enhanced Shuttle Radar Topography Mission.
43 December 12, 2012 Liberty 7/7 14d 7h ETL Kennedy ETL supply and crew rotation.
44 January 10, 2013 Endurance 7 15d 18h ETL Kennedy ETL supply and reboost.
45 February 13, 2013 Horizon 7 14d 20h ETL Edwards Echo construction flight ECF-22: Prototype laser communication system installation.
46 March 20, 2013 Terra Nova 7 15d 3h ETL Kennedy ETL supply and reboost.
47 May 12, 2013 Patriot 7 16d 6h ETL Kennedy ETL resupply, reboost and PGM propellant resupply. Original launch delayed due to accident on pad which caused the death of a contractor.
48 June 12, 2013 Liberty 7 11d 3h Kennedy Commercial satellite launch.
49 July 9, 2013 Intrepid 7 15d 7h ISS Kennedy ISS supply.
50 September 12, 2013 Endurance 7 15d 7h ETL Kennedy ETL supply and reboost.
51 October 14, 2013 Constitution 7 15d 7h Edwards Earth and life science research flight. Astrotech Research Double Module and dual Extended Duration Orbiter pallets.
52 November 18, 2013 Terra Nova 7 13d 7h Edwards Landsat 9 launch.
53 December 10, 2013 Horizon 7 14d 7h ETL Kennedy ETL supply and reboost.

List of Russian shuttle flights

Order Day Year Mission Shuttle Crew Duration Landing Site Notes
B1 December 10 2009 1L1 Baikal 0 00d 04h 31m Baikonour Unmanned test flight; first flight of Baikal.

Cancelled and shortened missions